Hi David
Thanks for the reply.
I thought that should be the case.
I'm back at the site next week and will investigate further.
Nigel
David W. Fenton wrote:
[Quoted Text] >> Does ReplMan need to be loaded for scheduled synchs between a >> managed replica and an unmanaged replica to occur? > >No. Only the synchronizer. > >> Everything has been working fine with my Access XP synch until >> last week when I closed Replication Manager (I'd left it loaded on >> the server for a few months). Since then the scheduled synch >> between a managed hub and an unmanaged replica have not occurred. >> The synchronizer is still loaded. I launched Replication Manager >> and the scheduled synchs occurred again. > >Huh. That shouldn't be the case. The schedule is managed by the >synchronizer, not by ReplMan. > >The last time I had scheduled synchs, ReplMan was not loaded all the >time, only the synchronizer. >
-- Message posted via AccessMonster.com http://www.accessmonster.com/Uwe/Forums.aspx/access-replication/200607/1
|