Group:  Microsoft Access ยป microsoft.public.access.replication
Thread: ReplMan Needs to Run?

DotNetBag
.NET Development Newsgroups

HTVi
TV Discussion Newsgroups

Our Hot Pick: Rising Antivirus 2006 - Certified by TUV & Checkmark! Get 10% discount by entering this coupon code: ONDISCOUNT10
Rising Antivirus 2006

ReplMan Needs to Run?
"Nigel Scott via AccessMonster.com" <u20978[ at ]uwe> 06.07.2006 09:57:49
Does ReplMan need to be loaded for scheduled synchs between a managed replica
and an unmanaged replica to occur?

Everything has been working fine with my Access XP synch until last week when
I closed Replication Manager (I'd left it loaded on the server for a few
months). Since then the scheduled synch between a managed hub and an
unmanaged replica have not occurred. The synchronizer is still loaded. I
launched Replication Manager and the scheduled synchs occurred again.

Thanks for any advice

Nigel

--
Message posted via AccessMonster.com
http://www.accessmonster.com/Uwe/Forums.aspx/access-replication/200607/1
Re: ReplMan Needs to Run?
"David W. Fenton" <XXXusenet[ at ]dfenton.com.invalid> 06.07.2006 23:19:10
"Nigel Scott via AccessMonster.com" <u20978[ at ]uwe> wrote in
news:62d5cd5d2aed5[ at ]uwe:

[Quoted Text]
> Does ReplMan need to be loaded for scheduled synchs between a
> managed replica and an unmanaged replica to occur?

No. Only the synchronizer.

> Everything has been working fine with my Access XP synch until
> last week when I closed Replication Manager (I'd left it loaded on
> the server for a few months). Since then the scheduled synch
> between a managed hub and an unmanaged replica have not occurred.
> The synchronizer is still loaded. I launched Replication Manager
> and the scheduled synchs occurred again.

Huh. That shouldn't be the case. The schedule is managed by the
synchronizer, not by ReplMan.

The last time I had scheduled synchs, ReplMan was not loaded all the
time, only the synchronizer.

--
David W. Fenton http://www.dfenton.com/
usenet at dfenton dot com http://www.dfenton.com/DFA/
Re: ReplMan Needs to Run?
"Nigel Scott via AccessMonster.com" <u20978[ at ]uwe> 07.07.2006 06:52:42
Hi David

Thanks for the reply.

I thought that should be the case.

I'm back at the site next week and will investigate further.

Nigel



David W. Fenton wrote:
[Quoted Text]
>> Does ReplMan need to be loaded for scheduled synchs between a
>> managed replica and an unmanaged replica to occur?
>
>No. Only the synchronizer.
>
>> Everything has been working fine with my Access XP synch until
>> last week when I closed Replication Manager (I'd left it loaded on
>> the server for a few months). Since then the scheduled synch
>> between a managed hub and an unmanaged replica have not occurred.
>> The synchronizer is still loaded. I launched Replication Manager
>> and the scheduled synchs occurred again.
>
>Huh. That shouldn't be the case. The schedule is managed by the
>synchronizer, not by ReplMan.
>
>The last time I had scheduled synchs, ReplMan was not loaded all the
>time, only the synchronizer.
>

--
Message posted via AccessMonster.com
http://www.accessmonster.com/Uwe/Forums.aspx/access-replication/200607/1

Home | Search | Terms | Imprint | Contact
Newsgroups Reader - provided by WiredBox.Net